Abstract
The creation of the cascade of hydroelectric power stations in Dnepr-river channel was accompanied by creation of artificial water basins. Change of hydro-geological conditions has resulted in flooding of adjoining territories and necessity of maintenance of the operational suitability of buildings and constructions located on them. The results of works on restoration of automobile overbridge above railroad tracks with intensive movement of trains in the city of Nikopollocated on the coast ofKakhovskoewater basin are presented. During operation more than 40 years, the inadmissible deformations in the above-ground overbridge constructions, caused by non-uniform settlements of foundations of supports, have taken place. The non-uniformity of foundations settlements has achieved600 mm.The foundations settlements were due to the changes of physical-and-mechanical characteristics of loessial soil of foundation owing to heaving of the underground water level.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.