Abstract

This paper describes the experiences and results of performing a reliability centered maintenance (RCM) analysis for substation transmission equipment. The RCM analysis was used to evaluate the maintenance policies of circuit-breakers, disconnectors and power transformers. Fault data helped to perform analyses by giving a valuable information of a long-term behaviour of equipment. As a result of the analyses some service intervals were extended.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call