Abstract

The period of commissioning of P-61 boilers at stations Nos. 1 and 2 of the Berezovsk state regional thermal power plant (BGRES-1) and measures for improving the operation of boiler components in order to prolong steady performance of 800-MW power generating units in the load range of 650 – 700 MW are considered. Suggestions of the personnel of BGRES-1 and ZiOSib on modification of the P-67 boiler of unit 3 are presented including reshaping of the platens above the furnace, replacement of the convection superheater by double-stage L-shape platens, corridor arrangement of the loops of the convection superheater, and 30% widening of the surface of the economizer. Planned renovations of the P-67 boiler of units 1 and 2 are discussed.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.