Abstract
The chief issues in the operation of combined-cycle power plant (CCPP) heat recovery steam generators at the stage of maturation of this technology in the power industry of Russia are outlined. The design evolution is shown for heat recovery steam generators (HRSG), reflecting the problems of ensuring rapid start-ups of CCPPs and limiting the failure rate of thick-walled elements of the HRSG steam-water path; and an approach is proposed for designing programs for maintenance of heat exchange steam generators.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.