Abstract

1. As shown by the experience of long-term operation of earth structures of the cascade, on dams (embankments) being constructed by the method of dumping soil into water, when designing the slopes of these structures it is necessary to impose more stringent requirements with respect to determining the steepness of these slopes to increase their reliability, as is done for structures constructed dry. 2. To organize successful monitoring of seepage processes in the investigated structures having substantial anisotropy of the soil, special recommendations on the efficient disposition of piezometers under such specific conditions should be worked out. Recommendations on the disposition of piezometers under conditions of a noticeable effect of the groundwater regime of the surrounding territory on the seepage regime of the hydro development should be worked out accordingly. 3. Since the calculations made in the work, as a result of which instability of many slopes was detected, are not always confirmed by practice (there are examples of failure-free operation of slopes whose stability factors are considerably less than unity), it is advisable to correct the method of such calculations with consideration of the characteristics of the formation of the seepage flow in the downstream shoulder of dams with pronounced anisotropy of the soil.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.