Abstract

1. The long, trouble-free operation of the water power and electrical equipment of the Tereblya-Riksk hydroelectric power station and the present conditions of its operation in the L'vov power grid support the possibility of uniting turbine-generator units of stations into one enlarged rigid block “three generators-two transformers.” 2. Based on the level of automation, role, and regime of operation of hydroelectric power stations in a grid, there is the real possibility of converting it to remote control. 3. The unification of turbine-generator units into a single block and remote control of hydroelectric power stations will reduce its annual operating expenses by 40, 000 rubles.