Abstract
This paper describes the 1500-volt suburban electrification in operation between Cape Town and Simonstown. A general survey is given of the local conditions and of the system, and this is followed by more detailed descriptions of the difficulties experienced in operation.The paper deals only with those difficulties which are connected with the rolling stock and which necessitated modifications to suit local conditions. The items reviewed cover pantographs, main motors, auxiliary machines, gears and pinions-with special reference to the importance of lubrication, bogies and wheels.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
More From: Journal of the Institution of Electrical Engineers
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.