Abstract

Recent technical developments have made it possible to generate electricity from geothermal resources with low and medium enthalpy. One of these technologies is the Kalina Cycle System (KCS-34). In this study, electricity generation from Simav geothermal field is investigated. The optimum operating conditions for the KCS-34 plant design are determined on the basis of the exergetic and life-cycle-cost concepts. With the best design, power generation of 41.2 MW and electricity production of 346.1 GWh/a can be obtained with an energetic efficiency of 14.9% and exergetic efficiency of 36.2%. It is shown that, with the currently prevailing interest and inflation rates, the plant designs considered are economically feasible for values of the present worth factor ( PWF) higher than 6.