Abstract
Electricity generation is achieved by means of the medium-temperature geothermal water in the range of 90–140 oC in binary plants with the organic Rankine cycle. So, we investigate a binary geothermal power plant as a case study, from the energy and exergy point of view. Also, exergy destruction rates throughout the plant are quantified and illustrated for comparison purposes. In the plant considered, the brine injection and reinjection temperatures are 140 and 80 oC, with a mass flow rate of 64.87 kg/s, respectively. The energy and exergy efficiencies are calculated as 5.34 and 30.84 %, respectively, based on the heat and exergy input rates to the system at the net power. Furthermore, we examine the effects of some parameters on energy and exergy efficiencies and net power output (e.g., brine injection temperature, brine mass flow rates, turbine inlet temperature and inlet pressure).
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.