Abstract

In this paper a case of three-layer wall and fitting windows is described. The walls outside layer are made of clinker brick. The public basis is a situation, which occurred in an office building. In this building was a water stain on the windows inside the upstairs part the building, during the rain. In project of the building there were no details of performing three-layer wall and fitting of windows. In Poland one did not described in detail the realization for windows installation in three-layer wall.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.