Abstract

A pilot-scale anaerobic membrane bioreactor (AnMBR) was designed and optimized for the treatment of real distillery wastewater. A low hydraulic retention time of 3.5 days was reached after only 3 weeks. The AnMBR could treat up to 3.97 gCOD/L/day with high biogas production at 1.36 NLbiogas/Lbioreactor/day. The performances of an AnMBR and an anaerobic packed-bed bioreactor for treating the same wastewater were compared. The AnMBR had a shorter start-up period (21 days), a higher COD removal efficiency (96.9 %), and higher stability and methane production (0.26 LCH4/gCODinput), indicating the interest of investigating AnMBR industrialization. The membrane performance was also studied, demonstrating a long cleaning cycle interval of at least 44 days. The transmembrane pressure and Food-to-Microorganism ratio were defined to minimize membrane fouling without affecting the anaerobic digestion performance.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call