Abstract

In the year 2013 the modernization of a railway track between the cities Rokycany and Plzeň had began. This project, which is part of the third Czech Railway Transit Corridor includes partly reconstruction of the existing track and partly construction of a completely new track. Because of this, in the part between Ejpovice and Plzeň, new structures like bridges, culverts as well as tunnels have to be done. Two tunnel tubes under the hills Homolka and Chlum will be excavated by S-799 Herrenknecht tunneling machine and after its completion they will be the longest railway tunnels in the Czech Republic. The complete length will be 4150 meters. Tunnel lining segments are made of fiber-reinforced concrete.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.