Abstract

Current researches of material engineering give little investigations on the construction impacts of soil consolidation material property. Based on the Shanghai tunneling case, the excavation mechanics analyses for shield tunnels are conducted considering soil consolidation material property using 3D (three-dimensional) finite element numerical simulation method. The longitudinal deformation behaviors for existing tunnel after the completion of shield tunnel excavation are obtained under several typical cases of soil consolidation, including one month later, one year later, and ten years later. It is shown that the consolidation material property has a significant post-construction time effects on the vertical displacements of existing tunnels. The stringent stipulations on controlling the deformation for buried structures and strengthened monitoring measures are necessary and substantial for reducing potential service risks according to the post-construction state.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.