Abstract

Tube-Tube sheet welding area of Steam Generator is one of the most fallibility positions in the first loop of Nuclear Power Plant. To make sure the Secondary side hydro-test of on site of Steam Generator is successful at the first round, the relative parties organize to check the 8948 Tube-Tube sheet sealing welding area before the test. Through the introduction of the Checking progress, for example, Defect confirming, Defect location, Defect dealing, Defect repair and other progress, the basic reason of deviation has been analyzed. And also, some discussions and concerns were given which will very useful as an experience feedback.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.