Abstract

In this paper, we consider the balanced unidirectional cyclic layout problem (BUCLP) arising in the determination of workstation locations around a closed loop conveyor system, in the allocation of cutting tools on the sites around a turret, in the positioning of stations around a unidirectional single loop AGV path. BUCLP is known to be NP-Complete. One important property of this problem is the balanced material flow assumption where the material flow is conserved at every workstation. We first develop a branch-and-bound procedure by using the special material flow property of the problem. Then, we propose a dynamic programming algorithm, which provides optimum solutions for instances with up to 20 workstations due to memory limitations. The branch and bound procedure can solve problems with up to 50 workstations.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.