Abstract

In this paper, the branch and bound technique used to solve a single machine scheduling problem, which is the problem of scheduling n-job on a single machine of multi-objective function with triangle fuzzy due date numbers which are formulated as . The target of this paper is to obtained optimal sequence of our problem. The computational results are calculated by using Matlab program and compare the results with the complete enumeration method.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.