Abstract

Nowadays, energy-efficient scheduling has assumed a key role in ensuring the sustainability of manufacturing processes. In this context, we focus on the bi-objective problem of scheduling a set of jobs on identical parallel machines to simultaneously minimize the maximum completion time and the total energy consumption over a time horizon partitioned into a set of discrete slots. The energy costs are determined by a time-of-use pricing scheme, which plays a crucial role in regulating energy demand and flattening its peaks. First, we uncover a symmetry-breaking property that characterizes the structure of the solution space of the problem. As a consequence, we provide a novel, compact mixed-integer linear programming formulation at the core of an efficient exact solution algorithm. A thorough experimental campaign shows that the use of the novel mathematical programming formulation enables the solution of larger-scale instances and entails a reduction in the computational times as compared to the formulation already available in the literature. Furthermore, we propose a new heuristic that improves the state-of-the-art in terms of required computational effort and quality of solutions. Such a heuristic outperforms the existing heuristics for the problem and is also capable of speeding up the exact solution algorithm when used for its initialization. Finally, we introduce a novel dynamic programming algorithm that is able to compute the optimal timing of the jobs scheduled on each machine to further improve the performance of the new heuristic.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call