Abstract

This paper addresses minimizing Tardy/Lost penalties with common due dates on a single machine. According to this penalty criterion, if tardiness of a job exceeds a predefined value, the job will be lost and penalized by a fixed value. The problem is formulated as an integer programming model, and a heuristic algorithm is constructed. Then, using the proposed dominance rules and lower bounds, we develop two dynamic programming algorithms as well as a branch and bound. Experimental results show that the heuristic algorithm has an average optimality gap less than 2 % in all problem sizes. Instances up to 250 jobs with low variety of process times are optimally solved and for high process time varieties, the algorithms solved all instances up to 75 jobs.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.