Abstract

This paper studies the problem of designing wide area networks (WAN). In the paper the two-criteria topology assignment problem with two constraints is considered. The goal is select flow routes, channel capacities and network topology in order to minimize the total average delay per packet and the leasing cost of channels subject to the budget constraint and delay constraint. The problem is NP-complete. Then, the branch and bound method is used to construct the exact algorithm. Also the approximate algorithm is presented. Some computational results are reported. Based on computational experiments, several properties of the considered problem are formulated.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.