Abstract

This paper proposes a new analytical model of manufacturing system with two parallel machine workstations. The machines in the system are non-identical unreliable machines, and the processing times, failure times and repair times of the machines are assumed to be exponentially distributed. In this paper we for the first time give an exact model of two workstation parallel machine system. Case studies show the accuracy of the proposed model.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.