Abstract

We study a single-machine scheduling problem that is a generalization of a number of problems for which computational procedures have already been published. Each job has a processing time, a release date, a due date, a deadline and a weight representing the penalty per unit-time delay beyond the due date. The goal is to schedule all jobs such that the total weighted tardiness penalty is minimized and both the precedence constraints as well as the time windows (implied by the release dates and the deadlines) are respected. We develop a branch-and-bound algorithm that solves the problem to optimality. Computational results show that our approach is effective in solving medium-sized instances, and that it compares favorably with existing methods for special cases of the problem.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.