Abstract

Exponentially weighted moving average (EWMA) control charts can be designed to detect shifts in the underlying process parameters quickly while enjoying robustness to non-normality. Past studies have shown that performance of various EWMA control charts can be adversely affected when parameters are estimated or observations do not follow a normal distribution. To the best of our knowledge, simultaneous effect of parameter estimation and non-normality has not been studied so far. In this paper, a Markov chain approach is used to model and evaluate performance of EWMA control charts when parameter estimation is subject to non-normality using skewed and heavy-tailed symmetric distributions. Using standard deviation of the run length (SDRL), average run length (ARL), and percentiles of run lengths for various phase I sample sizes, we show that larger phase I sample sizes do not necessarily lead to a better performance for non-normal observations. Copyright © 2015 John Wiley & Sons, Ltd.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call