Abstract

Integration of process planning and scheduling is one of the most important functions to support flexible planning in a multi-plant. The planning and scheduling are actually interrelated and should be solved simultaneously. In this paper, we propose an advanced process planning and scheduling model for the multi-plant. The objective of the model is to decide the schedules for minimizing makespan and operation sequences with machine selections considering precedence constraints, flexible sequences, and alternative machines. The problem is formulated as a mathematical model, and an evolutionary algorithm is developed to solve the model. Numerous experiments are carried out to demonstrate the efficiency of the proposed approach.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.