Abstract

Water-soil gushing in shield tunnels has been a major threat to the safety of tunnel structures. However, traditional numerical methods cannot reasonably simulate large soil deformation around the tunnel caused by the water-soil gushing. Therefore, it is difficult to reveal the evolution of the internal force and deformation of tunnel structures. In this paper, based on the two-phase Material Point Method, the numerical analysis method for the water-soil gushing was established to investigate the development of water-soil pressure acting on the tunnel surface, and then the evolution of the tunnel mechanical behaviours in the process of tunnel gushing was further studied. The results indicate that during the “rapid gushing stage”, the tunnel surface pressures around the leakage point decrease sharply, whereas those on the tunnel invert increase significantly. This gives rise to a significant increase in the shear force and bending moment of the tunnel lining, with increase rates of 114% and 82%, respectively. In addition, the axial and angular deformation of Joint No.2 near the leakage point increased significantly, which may lead to serious longitudinal joint dislocation or even concrete crushing. Thus, close attention to the joint deformation is required.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call