Abstract

This paper systematically constructs a multi-project and a multi-objective human resource scheduling mathematical model in construction projects and puts forward an improved genetic algorithm to solve it by aiming at the problems existing in the process of human resource scheduling and optimization. Specifically, first, the basic mathematical models of GPRs and resource-constrained construction project human resource scheduling problem (RCWSP/GPRs) are established, and the multi-project equilibrium problem is extended. Then, an improved inter-cluster separation (ICS) algorithm is proposed and used to solve the RCWSP/GPRs problem. Finally, on this basis, the mathematical model of multi-project and multi-objective human resource scheduling problem and the solution method based on multi-objective-integrated circuit are proposed. At the same time, the resource-constrained multi-project and multi-skill human resource scheduling problem and the integer programming mathematical model under the generalized priority relationship are proposed. Also, the simulation results verify the accuracy of the proposed algorithm and model.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call