Abstract
In order to speed up the boiler start-up, especially from the cold state, the boiler evaporator may be flooded with hot water at the beginning of the process. The temperature of water supplied to the boiler evaporator through lower chambers of the boiler furnace chamber waterwalls will be found from the condition of equality between allowable stresses and circumferential thermal stresses on the edge of the opening for the downcomer. Two mathematical models of the evaporator hot-water heating are presented in this paper – one with lumped and the other with distributed parameters. In both cases, the water level is identical. The hot water needed to fill the boiler evaporator may be supplied from the feed water tank of another operating boiler or from a hot water vessel.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.