Abstract

Abstract This paper conducts analysis on problems occurred during the development of Sazhong Area in Daqing Oilfield such as small reserve controlled by basic well pattern, low ultimate recovery efficiency, etc. It introduces the solution of infilling adjustment, analyzes and evaluates on full scale various production indexes like production rate, formation pressure, control degree and production situation of different formations, effect in old wells, and ultimate recovery efficiency, etc. after each infilling adjustment. Result shows that recovery efficiency can be improved by 6–8% after primary infilling adjustment, 4–5% to 45.5% after secondary infilling adjustment, and to 47.48% after tertiary infilling adjustment. It was realized that only when certain well pattern density was reached through reasonable division of formation series and multiple infilling adjustment, can we improve the control degree of various kind of formations and the ultimate recovery efficiency, and develop the continental heterogeneous reservoir with high efficiency and high quality.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.