Abstract
A study was conducted to demonstrate the effectiveness of a wet abrasive blasting technology to remove lead-based paint from exterior wood siding and brick substrates as well as to evaluate the effectiveness of two waste stabilization technologies to stabilize the resulting blast media (coal slag and mineral sand) paint debris thereby reducing the leachable lead content. The lead-based paint removal technology effectiveness was determined by the use of an X-ray fluorescence (XRF) spectrum analyzer (L- and K-shell). The effectiveness of the technologies to stabilize the debris was evaluated through the toxicity characteristic leaching procedure (TCLP). Wet abrasive blasting effectively removed the lead-based paint coating from both the wood and brick substrates to below the US Department of Housing and Urban Development Guideline (1 mg/cm 2) with no minimal or no damage to the underlying substrates ( P<0.0001). The mean area air levels of lead-containing particulate generated during paint removal were significantly below the personal exposure limit (PEL) ( P<0.0001). However, the mean personal breathing zone lead levels were approximately three times higher than the PEL. Neither of the two stabilization technologies consistently stabilized the resultant paint debris to achieve a leachable lead content below the RCRA regulatory threshold of <5 mg/l.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.