Abstract

Singkarak hydro power plant (SHPP) with the capacity of 175 MW provide essential supply to Sumatera Interconnection System thus reliable and efficient operation of the hydro power plant component must be maintained. With the damaged experienced by the trash rack during Padang earthquake, the operation of the power plant was disturbed and replacement of trash rack need to be executed. This study evaluate the modification of trash rack replacement in terms of head loss, potential energy and revenue losses. This simple evaluation finds that the replacement design gives lower head loss which translated to lower energy and revenue losses. The potential energy and revenue losses also increase exponentially with the increase of trash rack blockage. This result amplify the importance of trash rack design and cleaning during operation of a hydro power plant.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.