Abstract

One of the efforts that can be done to evaluate the performance of water injection in a field is by monitoring the injector wells. Observations can be made by looking at the flow rate and injection pressure at each injector well. The response given by each injection well will be able to represent the injection performance on a field scale. The EX structure is a structure that has been produced for more than 40 years. In addition, water injection has also been applied for approximately 16 years. There are four injection wells operating in this EX structure with an average injection flow rate of 3000-8000 bwipd per well. Evaluation of injection well performance is carried out by conducting a Hall Plot on each injection well from the start of the injection process to the last data obtained. Based on the evaluation results, it was found that there was plugging in the EA-IIS and EJ-IVS injection wells. Stimulation activity is needed in both wells to restore the well injection capability. Meanwhile, for the EA-IS and EB-IIL injection wells, there are no significant problems in those wells so they can still function properly as injection wells.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.