Abstract

Differential settlement between the bridge approach embankment and bridge abutment is a major issue in bridge engineering. To mitigate the differential settlement, a new ground-improvement technique, a fixed-geogrid-reinforced and pile-supported embankment (referred to as a FGT embankment) was proposed. To investigate the performance of the FGT embankment, a numerical analysis was performed for a trial bridge approach embankment in Changzhi, China. The numerical model was carefully calibrated to ensure good representation of the realistic conditions. The comparison analyses and parametric study were conducted to evaluate the effects of the traffic load, long-term tensile stiffness of the geogrid, and long-term elastic modulus of the soil. The results show that the FGT embankment can reduce the settlement, enhance the stability, and offer a better performance measure for the construction of a high embankment at the bridge approach.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.