Abstract

In tunnel excavation by Tunnel Boring Machine (TBM), it is difficult to grasp the ground condition ahead of and surrounding the tunnel face because the face cannot be observed during tunnel driving. This is the reason why it has not been possible to make the best use of high-speed excavation capability of the TBM, especially in ground under complex conditions. Thus, the TBM Excavation Control System was developed to realize the accurate prediction of the geological condition ahead of and surrounding the tunnel face simultaneously with excavation. The special feature of this system is that geostatistical techniques are introduced into the data analysis using both drill logging data from pilot boring and TBM driving data obtained during excavation, in order to improve the precision of the ground mapping.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.