Abstract

Reliable assessment of the fatigue resistance of asphalt pavement with a long-term service is critically crucial for the rational formulation of original pavement utilization strategies in reconstruction and expansion projects. Currently, the pavement performance evaluation indicators are mainly used to guide pavement preventive maintenance, and its applicability in reconstruction and expansion projects of the freeway is limited. This paper aims to propose an evaluation method of fatigue resistance of asphalt concrete utilizing semi-circular bending (SCB) tests and stereo digital image correlation (stereo-DIC) techniques. A total of 27 asphalt concrete cores were drilled from the three freeways (K84, K124, and K165) with a service life of more than 20 years, and the SCB specimens were produced to conduct the SCB fracture and fatigue tests. During the SCB test, the stereo-DIC technique was employed to monitor the evolution process of the strain distribution and crack length for the specimens. K-dimension tree neighbor-searching algorithm (K-d tree algorithm) was used to effectively measure the change of crack length corresponding to each fatigue load cycle. Meanwhile, the strain threshold of asphalt concrete crack initiation was determined by the bilinear softening cohesive zone model (CZM) to ensure the accuracy of the crack length calculated by the K-d tree algorithm. Furthermore, the relationship between crack growth rate and stress intensity, which was used to fit the Paris law parameters, was determined. The CZM and DIC results indicated that the strain threshold of asphalt concrete crack should be set as 2000 με when using the K-d tree algorithm to determine the crack length. With the stress ratio increase, the Paris law parameter A increased wavily, and the parameter n decreased steadily, while the threshold of the stress intensity factor increased steadily. The Paris law master curves could characterize the fatigue performance of various road sections at a wide load range. The residual fatigue life of K84, K124, K165 the road sections were 2.13E + 08, 3.57E + 08, and 1.02E + 07, respectively.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.