Abstract

A field-scale technology demonstration has been conducted to optimize polyphosphate remediation technology for enhanced monitored natural attenuation of the uranium plume within the 300 Area aquifer at the Hanford Site, southeastern Washington State. The objective was to evaluate the efficacy of polyphosphate to treat uranium-contaminated groundwater in situ. Focused application of polyphosphate was conducted in a source or 'hot spot' area to reduce the inventory of available uranium contributing to the groundwater plume through direct precipitation of uranyl-phosphate solids and secondary containment via precipitation of apatite which can serve as a long-term sorbent for uranium. The test site consisted of an injection well and 15 monitoring wells installed in the 300 Area near the process trenches that had previously received uranium-bearing effluents. The results indicated sequestration of uranium as insoluble phosphate phases appears to be a promising alternative for treating the uranium- contaminated groundwater at the Hanford Site 300 Area. However, the formation of the apatite during the test was limited due to two separate overarching issues: (1) formation and emplacement of apatite via polyphosphate technology, and (2) efficacy of apatite for sequestering uranium under the present geochemical and hydrodynamic conditions.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.