Abstract

The article discusses the model of the power system taking into account the automatic voltage regulator of the generator at the occurrence of a self-clearing fault on the line. In this case, the grid contains series compensation. The generator is an electromechanical system consisting of a turbine and a synchronous generator with an excitation system. Time plots of rotation angles deviations of rotating parts of turbine, twisting torques, and also plots of maximum deviations of rotation angles and twisting torques from the level of series compensation are shown with the indication of the area in which they grow in time.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.