Abstract

PG Krebet Baru is one of the companies that have not implemented green supply chain management (GSCM). The main problems currently faced by PG Krebet Baru’s supply chain are low recycling process, fuel waste, and low raw material efficiency. The purpose of this research was to evaluate the performance of green supply chain management in PG Krebet Baru’s supply chain. Thus, alternative improvement can be formulated and proposed to be implemented. The method used in this study was Supply Chain Operation Reference (SCOR) and to determine the alternative of supply chain DEMATEL method was employed. The result of this calculation was 56.12, indicating an average performance for GCSM application in PG Krebet Baru. Alternative improvements proposed were focused on reduction of hazardous material (GP2), worker and environmental sanitation (GM9), product handling (GD1), and reuse of packaging (RL3).

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call