Abstract

One of the most important factors which have an effect on the cost and time of the building process is the organization of physical resources and the information flow structure. Depending on how effective this system is, a building project may end with a success or a failure. Because of many conditions of the construction executing and different needs of the contractors, there are different Supply Chain Management (SCM) systems connected with supplying construction projects: single-stage, multi-stage or combined. The article presents a comparative analysis of construction SCM systems based on a modified fuzzy AHP.The modification of this method is based on the use of interval type-2 fuzzy sets to aggregate evaluation according to the idea proposed by Mikhailov. The use of such a model of group preferences of decision-makers, makes it possible to take into consideration both the linguistic imprecision of an evaluation and the small number of experts. The weight values of specific criteria and the final scale vector of considered variants are obtained during the analysis. This may give a recommendation to general contractors in construction projects about which evaluation criteria and supply systems are preferred.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call