Abstract
Accurate location of buried utility infrastructures is a vital issue for utility owners, utility managers and engineers, designers, and contractors that perform new installations, repairs, and maintenance on highway projects. Unreliable information on underground utilities can result in undesirable consequences such as property damage, claims, and other social and environmental problems. Subsurface utility engineering (SUE) is becoming a significant method for reducing the potential for underground utility conflicts at the project planning phase. SUE accurately identifies, characterizes, and maps underground utilities through four quality levels. This study presents a SUE benefit–cost analysis (BCA) to encourage a better understanding of SUE and the use of SUE. Eleven main benefit factors and two cost factors are identified and estimated on twenty-two SUE projects and eight non-SUE projects from Pennsylvania Department of Transportation (PennDOT) districts. In addition, this study reveals the relationship between benefit–cost ratio and complexity levels of buried utilities.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.