Abstract

Higher electric vehicle (EV) adoption will stress the importance of demand flexibility to achieve more economic, efficient, and reliable grid operation. Charging technologies will be paramount in shifting temporally to better fit the variable generation of wind and solar. Therefore, analysis is warranted on the benefits of EV charge scheduling with respect to installation cost, operation cost, difficulty of implementation, and grid flexibility. We tackle this by analyzing the cost savings of implementing an EV charge scheduling infrastructure to reduce demand charges and installation costs. In this paper, we analyze a case study for operation of 16 level 2 chargers and 1 fast charger for two different building types. We then evaluate various test phases for controlling building and charging loads using an adaptive charging network (ACN) algorithm to characterize the ACN’s potential to reduce overall project cost.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.