Abstract
Basic elements of project planning are activity scheduling and resource allocation. In this study, meta-heuristic methods reviewed as an appropriate solution tool for resource-constrained project scheduling problem and the success of two meta-heuristic methods discussed. Resource constrained project scheduling problem which is an NP-hard problem solved with scatter search and genetic algorithm. Both algorithms do not disrupt the feasible search space during population generation. Algorithms compared in terms of resulting time and working principles.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.