Abstract

The economic viability of a photovoltaic (PV) installation depends on regulations regarding administrative, technical and economic conditions associated with self-consumption and the sale of surplus production. Royal Decree (RD) 244/2019 is the Spanish legislation of reference for this case study, in which we analyse and compare PV installation offers by key suppliers. The proposals are not optimal in RD 244/2019 terms and appear not to fully contemplate power generation losses and seem to shift a representative percentage of consumption to the production period. In our case study of a residential dwelling, the best option corresponds to a 5 kWp installation with surplus sale to the market, with a payback period of 18 years and CO2 emission reductions of 1026 kg/year. Demand-side management offers a potential improvement of 6%–21.8%. Based on the increase in electricity prices since 2020, the best option offers savings of up to €1507.74 and amortization in 4.24 years. Considering costs and savings, sale to the market could be considered as the only feasible regulatory mechanism for managing surpluses, accompanied by measures to facilitate administrative procedures and guarantees for end users.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call