Abstract
ABSTRACT The evaluation of gas producing properties is made more difficult by increased market competition from fuel oil, random production curtailments and the abrogation of contracts. The bank engineer must construct a cash flow projection which incorporates a combination of technical and market factors from incomplete information in a rapidly changing market. By using a technical determination of the reserves as a target, he can forecast production rates that are consistent with anticipated market conditions.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.