Abstract

Recently, several papers on preventive maintenance (PM) have shown that segregation of PM’s can be beneficial when it comes to improving factory performance. However, these were limited to either cases of equal PM segregation and/or without consideration of other factors and operating conditions such as incurred setup or the number of tools in the toolset. In this paper, we extend previous work in this area in two major respects. First, we consider the more realistic case of PM segregation into equal or unequal portions and second, we evaluate the impact of PM segregation under various operating conditions via simulation. Our simulation experiments provide insight and guidelines for practitioners in planning the PM activity such that the overall performance is improved.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.