Abstract

Hydraulic blind backfilling is used to reduce subsidence problems above old underground water-logged coal mines. This paper describes experimental research on a fully transparent model of a straight underground mine gallery. An automatic data acquisition system was installed in the model to continuously record the sand and water flowrates along with the inlet pressure of the slurry near the model's inlet. Pressure signature graphs and pressure loss curves with bed advancement under different flow conditions are examined. Pressure signature analyses for various flowrates and sand slurry concentrations are conducted to evaluate a pre-jamming indication parameter, which could be used to indicate the arrival of the final stage of filling.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.