Early year of 2014 flood was ranked first in the natural disasters with 69 incidences. Bengawan Solo floods is an annual natural disastersin Bojonegoro. Study’s results in 2011 showed that RHA activities was not maximum that pre-disaster activities should be evaluated. Based on management functions, planning is the very first step. Evaluation of pre-disaster planning is the earliest thing to do to minimize the disasters impact. This study aimed to evaluate activities of floods pre-disaster planning in Bojonegoro year 2014. Data were collected by interview anddocument study. Data were analyzed descriptively. The results showed that based on input components, SOP and facilities had met the standard, while the staff, the type of data, and funds had’nt metthe standard yet. Based on process component, contingency planning had been done according to the standard. Both geomedic mapping and identification of social and economic in the process of activities planning of prevention, mitigation, and disaster response preparedness actions didn’t conduct. Based on the output component, the health department already had a contingency plan, but didn’t have geomedic maps and prevention, mitigation, and disaster response preparedness actions plan. This study concluded that pre-disaster planning activities of Bojonegoro Regency Health Office wasn’t good. The suggestion given are control SOP, increase the staff amount, complete thedata types, allocate funds, make budgettaryplanning, provide vehicles, conduct identification of social and economic, give training to staffs, and make outline of the geomedicmap and prevention, mitigation, and disaster response preparedness actions plan.Keywords: planning, pre-disaster, floods

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call