Abstract

Stress corrosion cracks have been discovered in Group Distribution Headers (GDH) at the Ignalina and Chernobyl Nuclear Power Plants. This increases the probability that a guillotine pipe break can occur that creates a whipping pipe (GDH) with the potential to damage surrounding structures—i.e. adjacent GDH and its attached piping or adjacent reinforced concrete compartment wall. The GDH is the most important component for reactor safety in case of an accident. Emergency Core Cooling System (ECCS) piping is connected to the GDH piping such that, during an accident, coolant passes from the ECSS into the GDH. Presented in this paper is the transient analysis of a Group Distribution Header following a guillotine break at the blind end of the header. Using a very conservative force loading function, the transient response of a whipping RBMK-1500 GDH along with neighboring concrete walls and pipelines is obtained using finite element methodology. The results of the study, assuming that the impacted GDH does not suffer stress corrosion cracking, indicate that the structural integrity of the compartment should be maintained and failure should not propagate from GDH to GDH.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.