Abstract

Overall equipment effectiveness is one of the important tools to measure the productivity in the company. This research is based on a case study of cement manufacturing industry in Indonesia, especially in kiln machine. The research aims to investigate the six big losses. In addition, the calculation of availability components, performance efficiency, and quality rate are carried out. The fishbone diagram is also employed to identify the root cause of the problem deeply. The results show the biggest losses in the kiln machine are the reduced speed losses. Therefore, the availability component and the performance efficiency should be improved to increase the productivity and the efficiency in the shop floor. Some suggestions are presented such as make a better surveillance system, improve the planning of preventive maintenance machine, and replace the more sophisticated maintenance tools to facilitate maintaining the machine.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.