Abstract

The implementation of environmental mitigation and monitoring commitments made for four geopressure design well projects was evaluated. The evaluation was based on site visits conducted in August 1982 and April 1983 and on a review of monitoring and project activity reports provided by DOE contractors. The projects evaluated include: Pleasant Bayou No. 1 in Brazoria County, Texas; Dow Parcperdue in Vermilion Parish, Louisiana; and Gladys McCall and Sweet Lake No. 1 well sites in Cameron Parish, Louisiana. The contractors responsible for drilling and testing activities at the well sites have adequately implemented most of the mitigation measures described in each project's site-specific Environmental Assessment (EA). Exceptions include the lack of impermeable liners for drilling mud pits at the Dow Parcperdue, Gladys McCall, and Pleasant Bayou sites and the lack of a ring levee at the Pleasant Bayou site. Air and water quality and noise monitoring activities were not performed as strictly as outlined in the EAs. A review of the monitoring data collected to date indicates that no significant environmental degradation has occurred. This report recommends additional or future monitoring needs, especially with regard to soil contamination, subsidence, and microseismicity, and provides guidance for decommissioning.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call