Abstract
This paper presents the power quality measurement results of a commercial wind farm (WF) connected to Taiwan Power System. This 46-MW Jang-Bin WF with 23 2-MW doubly fed induction generators is connected to the Jang-Bin extra high-voltage substation of Taiwan Power Company (TPC) through six feeders and a step-up main transformer. The measured data were recorded from October 2 to November 6, 2013, for a total of 35 days. The recorded results include three-phase voltages, currents, active power, reactive power, apparent power, power factor, frequency, current harmonics, voltage flickers, and voltage variations. According to the measured results, it can be clearly observed that the power quality of the studied Jang-Bin WF during the measurement period can meet the grid code of TPC.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.