Abstract
This is a discussion on the process of implementing a system for power line communication (PLC). A PLC system is desired as it will allow for phase identification of the load and the transmission of data from the load to a central receiver. There are two main processes in a PLC system: a communications protocol and signal coupling. The communications protocol involves the methodology employed for successful communication between the load and the receiver. Signal coupling involves coupling the communication signal onto the power line at the load and off of the power line at the receiver. A successful implementation of these two processes will establish a system for PLC. The methodology employed for communication between devices is frequency shift keying (FSK). FSK will allow for low frequency operation with minimal attenuation. There are various coupling strategies that are presented for discussion. It is found that magnetically coupling a communication signal should be avoided and that a directly coupled signal generator should be implemented.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.